Skip to main content
Contact Contact

Tempus Fugit

Story

During the 2024–2025 season, Tempus Fugit visited Pendennis Vilanova for a comprehensive refit that spanned exterior, interior, mechanical, and systems upgrades. The scope of work included full undercover bulwark painting, as well as complete refinishing of the mast and boom, with new boom stickers and the removal and reinstallation of mast electrical fittings. Structural and surface repairs were carried out, including the treatment of small cracks on the keel and corrosion treatment and painting of the deck-hatch frames. Interior carpentry teams worked on hatches and repaired deckheads, while systems specialists renewed grey water and hydraulic hoses, serviced the main engine, watermaker, and through-hull valves, and removed, cleaned, and serviced the main propeller. The refit was completed with a helm-station modification and a series of small electrical works, ensuring the yacht left the facility in optimal condition for the season ahead.

Spec

Builder Arkin Pruva

Year of build 2013

Type Sailing Yacht

Naval Architect Humphreys Yacht Design

Exterior Styling Humphreys Yacht Design

Interior Design Humphreys Yacht Design

Construction Mahogany hull & mahogany superstructure

LOA 27.43m

Beam 5.6m

Draught Max 3.29m

Let's Talk

Whether you are looking for a brief pit-stop, a longer-term berthing option or a Mediterranean-based refit, our flexible approach and on-site facilities provide the perfect solution for any yacht.